GIDC

0
5
GIDC


  • Application Form

    • To apply online for Drainage Connection click here
    • To download and view Drainage Regulation Act 1990 please click on links given below
    • The Corporation provides facility of drainage connection in certain estates only. Please confirm with respective GIDC field office for availability of infrastructure.

  • Documents Checklist

    • The following documents should be kept ready and submitted along with the duly filled up application form of Drainage Connection.

      • Editable application form (Adhesive stamp of Rs. 300)
      • Copy of Offer cum Allotment letter
      • Copy of Approved Building Plans with letter
      • Copy of Licence Agreement / Form of Agreement
      • Approved primary ETP/STP plan by GPCB and certificate of installation
      • If Industrial unit – Copy of GPCB NOC + Copy of application made to GPCB
      • Water supply connection details (location of connection, quantity, size of connection etc.)
      • Water supply bills – Last 3 months (not mandatory)
      • Possession Receipt and /OR Final Transfer Order (Mandatory)

    Note : If necessary, GIDC will ask the applicant to submit other necessary documents to process the application.

  • Scrutiny Procedure

GIDC

The following verification is carried out by GIDC before providing approval and connection to applicant

  • If building plan is approved
  • Whether quantity applied for same in License Agreement/ Form of Agreement, GPCB NOC and mentioned in the application
  • If difference, then what is the reason (A query may be raised to the applicant in such case)
  • Scrutiny of NOC from GPCB
  • Verify that drainage connection can be given from the existing drainage line on facing road at distance
  • Whether allottee has been allowed to use treated water into garden or any other use/recycling/another disposal
  • Visits the site to fix the location of drainage chamber, verify the free fall arrangements in drainage connection chamber
  • Provides schematic diagram of connection from drainage mains to connection chamber, size of connection, and calculation of drainage connection charges, deposits, contribution charges to applicant

Note : Ideal time for processing a Drainage application without any queries post physical submission of application form and required documents at respective DEE office is as below.






No. Process Ideal time
1 Providing approval for connection 10 days from date of application
2 Providing physical connection on site Max 20 days from date of approval application (Provided all the formalities are completed by the Allottee)

 

  • Drainage Rate for the various Estates of GIDC
  • Remarks : The procedural steps outlined above are uniform, consistent, and applicable across all types of establishments, regardless of their risk category, firm size/category (small, medium, large), business location (whether rural or urban), and the type of investor (whether foreign or domestic).